I decided to knock down the ratings of the MeasureIt, WebRoute, and FileSync projects by 3-4 points as I don’t plan on finishing them any time soon, and they are pretty much the only items with a rating higher than 7 that aren’t in a “completed” (finished, ongoing, or abandoned) state.